posted on
Thursday, May 10, 2007 11:05 PM |
-
running the tubes to from the valve to the drink.
Mount the Co2 manifolds.
- Mount the additional Co2 regulator.
Run Co2 lines from manifolds to drinks.
- Create faucet for drinks (1 inch for 12 tubes, thinking maybe 2 1/2" or 3/4" that merge into a 1")
- Mount Relay boards
- Mount a power strip
Slightly tweak the current power layout scheme to fit 6 on each side.
- Run eletrical wiring (Neutral)
Run eletrical wiring (Hot)
- Test wiring layout
- Do a wet run test
- Deconstruct it
- Ship to Maker's Faire
A little FYI, crimping wire sucks
Showing a bit of leg

Tubing finally done

Wide view, only thing left to do is running 1 more wire

Co2 manifolds are mounted and ready for hooking up
